EngineeringPropertiesPC.com
[ICO]NameLast modifiedSize
[   ]A2 - Lead Agency Notice & FEAF 09-12-2022.pdf2022-09-26 07:31 1.3M
[   ]A6 - Adopted DEIS Scope 12-12-2022.pdf2022-12-14 13:34 412K
[   ]C1 - NYSDEC Wetlands Plan 09-21-2022.pdf2023-07-10 08:34 9.4M
[   ]H2 - Archaeological Survey Phase 1A&B Aug 2023.pdf2023-08-08 08:09 12M
[   ]E2 - Tree Inventory 08-2023.pdf2023-11-17 08:55 154K
[   ]A3 - Positive Declaration 11-14-2022.pdf2023-11-28 10:59 208K
[   ]A5 - Public Scoping Notice 11-14-2022.pdf2023-11-28 11:06 182K
[   ]A7 - Notice of Project Revision & Responses 05-2023.pdf2023-11-28 11:11 1.0M
[   ]D1 - 72-hr Pump Test Protocol 08-2023.pdf2023-11-28 11:28 8.7M
[   ]J1 - Establishment of Sewer District No. 3.pdf2023-12-07 11:55 1.1M
[   ]H1 - Correspondence with SHPO.pdf2023-12-21 11:45 194K
[   ]E3 - Tree Preservation Plan 01-19-2024.pdf2024-01-19 13:49 4.2M
[   ]J2 - WWTP Engineer's Report 12-08-2023.pdf2024-01-22 14:43 47M
[   ]D3 - Water System Report Jan 2024.pdf2024-01-23 07:07 4.6M
[   ]C4 - Wetland Functional Analyses Report 01-25-2024.pdf2024-01-25 13:12 8.4M
[   ]G3 - Alt 40-ft Height Photo Simulations Jan 2024.pdf2024-01-29 13:55 26M
[   ]E1 - Wildlife Habitat Assessment 07-06-2023.pdf2024-03-18 05:37 15M
[   ]F2 - Greenhouse Gas Analysis 04-2024.pdf2024-05-14 05:01 761K
[   ]Pump Test Report 06-04-2024 - Full report for USB.pdf2024-06-04 07:50 36M
[   ]C2 - Wetland Report MAR 2024 REVISION.pdf2024-06-24 08:45 208K
[   ]L - 21-22 Valley Central Schools Comprehensive Long Range Plan and Facilities (4).pdf2024-07-29 10:35 17M
[   ]C2 - ACOE Wetlands Plan 04-29-2024.pdf2024-08-08 11:24 19M
[   ]G1 - Existing Visual Assessment Study 04-07-2023.pdf2024-08-09 11:05 6.4M
[   ]K - Phase I ESA 08-29-2024.pdf2024-08-29 12:11 6.8M
[   ]B1 - Preliminary Soils Report 09-13-2024.pdf2024-09-13 11:03 1.7M
[   ]D2 - Pump Test Report 06-04-2024 - TO PRINT FOR DEIS BINDER.pdf2024-09-16 12:41 21M
[   ]C3 - SWPPP 09-17-2024.pdf2024-09-18 04:59 14M
[   ]A1 - Project Applications 09-13-2024.pdf2024-09-18 10:06 1.5M
[   ]Traffic Impact Study 09-05-2024 - Full report for USB.pdf2024-09-19 11:54 100M
[   ]I - Traffic Impact Study 09-05-2024 - TO PRINT FOR DEIS BINDER.pdf2024-09-19 12:45 4.9M
[   ]M - Realty Subdivision Plan 09-2024.pdf2024-09-19 13:14 2.8M
[   ]F1 - Air Quality Analysis 09-2024.pdf2024-12-03 06:15 1.5M
[   ]A4 - Reponses & Correspondence.pdf2024-12-03 10:08 6.5M
[   ]G2 - Proposed Action Photo-Simulations.pdf2024-12-09 13:05 26M
[   ]M - Sheffield Gardens Site Plans 12-11-2024.pdf2024-12-11 11:58 50M
[   ]103.0301 Sheffield DEIS Appendices.zip2024-12-11 13:14 427M
The above electronic file(s) have been prepared by ENGINEERING & SURVEYING PROPERTIES, PC and are being provided solely as a convenience and accommodation to the user and may not be shared or transmitted to others not a party to this agreement without prior written authorization. The data contained herein shall be accepted “as is”. ENGINEERING & SURVEYING PROPERTIES, PC does not make any expressed or implied warranty for the accuracy or completeness of any data contained in any electronic file(s) due to ease of modification upon release. Any electronic data provided by ENGINEERING & SURVEYING PROPERTIES, PC shall not be construed as final construction documents. Only hard copies (i.e., prints, paper copies, etc.) bearing the original signature and seal (in red or blue ink only) of the professional engineer may be relied on as authorized work product of ENGINEERING & SURVEYING PROPERTIES, PC. This information is proprietary and shall not be copied or used for any purpose not expressly authorized in writing by ENGINEERING & SURVEYING PROPERTIES, PC. By and through its acceptance of information contained in any electronic files, the user agrees to indemnify and hold ENGINEERING & SURVEYING PROPERTIES, PC harmless from any loss, damage, liability or cost, including reasonable attorney's fees, arising from any use or reuse of any electronic document or information.