EngineeringPropertiesPC.com
[ICO]NameLast modifiedSize
[   ]E2 - Tree Inventory 08-2023.pdf2023-11-17 08:55 154K
[   ]A5 - Public Scoping Notice 11-14-2022.pdf2023-11-28 11:06 182K
[   ]H1 - Correspondence with SHPO.pdf2023-12-21 11:45 194K
[   ]A3 - Positive Declaration 11-14-2022.pdf2023-11-28 10:59 208K
[   ]C2 - Wetland Report MAR 2024 REVISION.pdf2024-06-24 08:45 208K
[   ]A6 - Adopted DEIS Scope 12-12-2022.pdf2022-12-14 13:34 412K
[   ]F2 - Greenhouse Gas Analysis 04-2024.pdf2024-05-14 05:01 761K
[   ]A7 - Notice of Project Revision & Responses 05-2023.pdf2023-11-28 11:11 1.0M
[   ]J1 - Establishment of Sewer District No. 3.pdf2023-12-07 11:55 1.1M
[   ]A2 - Lead Agency Notice & FEAF 09-12-2022.pdf2022-09-26 07:31 1.3M
[   ]F1 - Air Quality Analysis 09-2024.pdf2024-12-03 06:15 1.5M
[   ]A1 - Project Applications 09-13-2024.pdf2024-09-18 10:06 1.5M
[   ]B1 - Preliminary Soils Report 09-13-2024.pdf2024-09-13 11:03 1.7M
[   ]M - Realty Subdivision Plan 09-2024.pdf2024-09-19 13:14 2.8M
[   ]E3 - Tree Preservation Plan 01-19-2024.pdf2024-01-19 13:49 4.2M
[   ]D3 - Water System Report Jan 2024.pdf2024-01-23 07:07 4.6M
[   ]I - Traffic Impact Study 09-05-2024 - TO PRINT FOR DEIS BINDER.pdf2024-09-19 12:45 4.9M
[   ]G1 - Existing Visual Assessment Study 04-07-2023.pdf2024-08-09 11:05 6.4M
[   ]A4 - Reponses & Correspondence.pdf2024-12-03 10:08 6.5M
[   ]K - Phase I ESA 08-29-2024.pdf2024-08-29 12:11 6.8M
[   ]C4 - Wetland Functional Analyses Report 01-25-2024.pdf2024-01-25 13:12 8.4M
[   ]D1 - 72-hr Pump Test Protocol 08-2023.pdf2023-11-28 11:28 8.7M
[   ]C1 - NYSDEC Wetlands Plan 09-21-2022.pdf2023-07-10 08:34 9.4M
[   ]H2 - Archaeological Survey Phase 1A&B Aug 2023.pdf2023-08-08 08:09 12M
[   ]C3 - SWPPP 09-17-2024.pdf2024-09-18 04:59 14M
[   ]E1 - Wildlife Habitat Assessment 07-06-2023.pdf2024-03-18 05:37 15M
[   ]L - 21-22 Valley Central Schools Comprehensive Long Range Plan and Facilities (4).pdf2024-07-29 10:35 17M
[   ]C2 - ACOE Wetlands Plan 04-29-2024.pdf2024-08-08 11:24 19M
[   ]D2 - Pump Test Report 06-04-2024 - TO PRINT FOR DEIS BINDER.pdf2024-09-16 12:41 21M
[   ]G2 - Proposed Action Photo-Simulations.pdf2024-12-09 13:05 26M
[   ]G3 - Alt 40-ft Height Photo Simulations Jan 2024.pdf2024-01-29 13:55 26M
[   ]Pump Test Report 06-04-2024 - Full report for USB.pdf2024-06-04 07:50 36M
[   ]J2 - WWTP Engineer's Report 12-08-2023.pdf2024-01-22 14:43 47M
[   ]M - Sheffield Gardens Site Plans 12-11-2024.pdf2024-12-11 11:58 50M
[   ]Traffic Impact Study 09-05-2024 - Full report for USB.pdf2024-09-19 11:54 100M
[   ]103.0301 Sheffield DEIS Appendices.zip2024-12-11 13:14 427M
The above electronic file(s) have been prepared by ENGINEERING & SURVEYING PROPERTIES, PC and are being provided solely as a convenience and accommodation to the user and may not be shared or transmitted to others not a party to this agreement without prior written authorization. The data contained herein shall be accepted “as is”. ENGINEERING & SURVEYING PROPERTIES, PC does not make any expressed or implied warranty for the accuracy or completeness of any data contained in any electronic file(s) due to ease of modification upon release. Any electronic data provided by ENGINEERING & SURVEYING PROPERTIES, PC shall not be construed as final construction documents. Only hard copies (i.e., prints, paper copies, etc.) bearing the original signature and seal (in red or blue ink only) of the professional engineer may be relied on as authorized work product of ENGINEERING & SURVEYING PROPERTIES, PC. This information is proprietary and shall not be copied or used for any purpose not expressly authorized in writing by ENGINEERING & SURVEYING PROPERTIES, PC. By and through its acceptance of information contained in any electronic files, the user agrees to indemnify and hold ENGINEERING & SURVEYING PROPERTIES, PC harmless from any loss, damage, liability or cost, including reasonable attorney's fees, arising from any use or reuse of any electronic document or information.